Property 3
Property 3 - The elevational difference between the centers of the front load wheels of Materials Handling Equipment in mm.
Read More
Property 3 - The elevational difference between the centers of the front load wheels of Materials Handling Equipment in mm.
Read More
Property II Meter - Method of testing the floors short wavelength profile against the Property II (3rd Edition) or Property F (4th Edition) limits of the Concrete Society's Technical Report 34 (TR34).
Read More
Property II - (From TR34 - 3rd Edition) To control flatness, the change in elevational difference between two consecutive measurements of elevational difference (Property 1) each measured over 300 mm.
Read More
Property 1 - The elevational difference in mm between two points 300 mm apart.
Read More
Property - Term used for defining floor regularity; elevational differences or measurements derived from elavational differences that are limited for each class of floor.
Read More
Profileograph - A profileograph is a mechanical device used to measure longitudinal and transverse profiles in a Very Narrow Aisle (VNA). The data is collected digitally and interpreted to determine the floor class.
Read More
Principal Contractor - The contractor employed by the client to construct the building.
Read More
Primer - A primer can be applied between a concrete surface and an overlay or repair material to promote adhesion and act as a bonding agent.
Read More
Preconstruction Planning - Preconstruction planning is an essential process of a successful floor slab project.
Read More
PPE - Personal Protective Equipment is worn by operatives in construction to protect themselves from on-site hazards.
Read MoreAsk one of our experts or suggest a definition.